Non-scientific publications

Final brochure

Dive right in the full output of the i-DREAMS project! Our communication manager interviewed the authors of the different deliverables to let them tell their research story in a non-scientific way. All these interviews were compiled in this brochure, together with a couple of short syntheses of the deliverables that are confidential, thus not publicly available on our website.

Deliverable interviews

These interviews are conducted with the authors of the deliverables to get a good insight in the content of the technical reports in easy-to-understand language.

Policy briefs

  • No.1, October 2020, “What is the i-DREAMS “Safety Tolerance Zone” and why do we need it?” (download)
  • No. 2, September 2022, “I dream of Zero. Enabling public fleets to lead by example – right now.” (download)
  • No. 3, April 2023, “How’s my Driving?” How Corporate Social Responsibility can support Road Safety, and how Road Safety can improve the Transport Business (download)

Flyers

  • Project general flyer (download)
  • TUM online driving simulator recruitment flyer
  • TUM simulator recruitment flyer in German (open flyer)
  • TUM field trail recruitment flyer in German (open flyer)
  • TUM field trial recruitment flyer in English (open flyer)
  • BARRA simulator recruitment flyer in Portuguese (open flyer)
  • BARRA bus field trial recruitment flyer in Portuguese (open flyer)
  • BARRA truck field trial recruitment flyer in Portuguese (open flyer)

i-DREAMS items in newsletters

  • NRSO newsletter (May 2019), announcing i-DREAMS presentation to be given at the NRSO Digitalisation & Road Safety Workshop, Athens 2019 (open newsletter)
  • NRSO newsletter (Aug 2019), announcing the i-DREAMS Driver Telematics survey (open newsletter)
  • NRSO newsletter (Dec 2019), announcing i-DREAMS presentation to be given at ITS Hellas – 5th Intelligent Transportation Systems Conference. (open newsletter)
  • NRSO newsletter (Sep 2020), announcing i-DREAMS 2nd Newsletter (open newsletter)
  • NRSO newsletter (Feb 2021), announcing i-DREAMS 3rd Newsletter (open newsletter)
  • NRSO newsletter (Feb 2022), announcing i-DREAMS 4th Newsletter (open newsletter)
  • NRSO newsletter (August 2022), announcing i-DREAMS 5th Newsletter (open newsletter)

i-DREAMS items on websites

  • FERSI Road Safety Research website, announcing i-DREAMS (open announcement)
  • BARRA constructed a separate i-DREAMS website containing multiple announcements on the ‘events’ and ‘laboratory’ tabs.
  • OSEVEN PC’s website, announcing participation in the i-DREAMS project (open announcement)
  • TU DELFT website (30/01/2019), announcing participation of Eleonora Papadimitriou in i-DREAMS (open announcement)
  • NRSO website (17/05/2019), announcing i-DREAMS presentation to be given at the NTUA-Digitalisation and Road Safety Research Workshop, Athens 2019 (open announcement)
  • CARDIOID website (22/05/2019), announcing the start of the i-DREAMS project (open announcement)
  • ADAS&me website (19/08/2019), announcing i-DREAMS as partner project (open announcement)
  • NRSO website (14/09/2019), announcing i-DREAMS Driver Telematics survey (open announcement)
  • MEDIATOR website (16/10/2019), announcing that i-DREAMS and Mediator met in The Hague (open announcement)
  • NRSO website (17/12/2019), announcing i-DREAMS presentation to be given at ITS Hellas – 5th Intelligent Transportation Systems Conference, Athens 2019 (open announcement)
  • NRSO website (23/01/2020), announcing i-DREAMS 1st Newsletter (open announcement)
  • NRSO website (25/04/2020), announcing i-DREAMS presentations at the Transport Research Arena (TRA) conference in Helsinki, 2020 (open announcement)
  • NRSO website (24/07/2020), announcing i-DREAMS 2nd Newsletter (open announcement)
  • TUM, School of Engineering and Design website (06/11/2020), announcing installation of a custom driving simulator by DSS (open announcement)
  • TUM, School of Engineering and Design website (08/12/2020), announcing that participants are wanted to participate in the driving simulator study (open announcement)
  • NRSO website (04/01/2021), announcing i-DREAMS 3rd Newsletter (open announcement)
  • TUM, School of Engineering and Design website (03/03/2021), announcing that participants are wanted to participate in the field trial (open announcement)
  • TUM, School of Engineering and Design website (27/01/2021), announcing master’s thesis topic, related to i-DREAMS, on on-road driving and analysis (open announcement)
  • RSKC Road Safety Knowledge Centre website (21/07/2021), announcing the i-DREAMS project (open announcement)
  • LeicestershireLive (21/02/2021), Earn £250 while just driving around – and help university conduct road safety research (open article)
  • TUM, School of Engineering and Design website (09/09/2021), announcing i-DREAMS contributions in the MT-ITS 2021 proceedings (open announcement)
  • NRSO website (20/12/2021), announcing i-DREAMS 4th Newsletter (open announcement)
  • NRSO website (01/06/2022), announcing i-DREAMS 5th Newsletter (open announcement)
  • POLIS website (10/10/2022), announcing second Policy Brief (open announcement)
  • NRSO website (12/12/2022), announcing i-DREAMS 6th Newsletter (open announcement)
  • NRSO website (31/03/2023), announcing i-DREAMS Final event in Brussels, April 2023 (open announcement)
  • NRSO website (02/05/2023), announcing i-DREAMS 7th Newsletter (open announcement)
  • POLIS website (25/04/2023) announcing third Policy Brief (open announcement)
  • POLIS website (26/04/2023), announcing the i-DREAMS Final Event (open announcement)

Presentations

  • Petraki, V. & Yannis, G. (2019). Driver-vehicle-environment interactions and safety tolerance. Presentation at the NRSO Digitalisation & Road Safety Workshop (6-12 May 2019) (download presentation)
  • Yannis, G. (2019). Enhancing drivers’ safety by monitoring the behaviour through smartphones. Presentation at the ITS Hellas – 5th Intelligent Transportation Systems Conference (17-18 Dec 2019) (download presentation)
  • i-DREAMS Pecha Kucha presentation video (watch the video online)
  • ŠRAML, Matjaž. i-Dreams: An overview of Safety Tolerance Zone for driver-vechile-environment interactions under challenging conditions : presentation at the 5th Trilateral Conference, Austria, Hungary, Slovenia and Czech Republic Cross-border testing of Automated Driving, 20. April, 2023. [COBISS.SI-ID 151054339]

Other

  • H2020 RTR Conference presentation – December 2020 – “i-DREAMS project presentation” – (watch the recording)
  • TVM Actueel Magazine – June 2020 – “Op zoek naar de Safety Tolerance Zone.” – (download)
  • UHasselt Jaarverslag 2019 – Technologietransfer en spin-offs – Zoveel mogelijk impact creëren: daar draait het om.” (download)
  • UHasselt Magazine – July 2019 – “Kan technologie ongevallen helpen voorkomen?” (download)
  • ŠRAML, Matjaž, GRUDEN, Chiara. Safety Tolerance Zone calculation and interventions for driver-vechile-environment interactions under challenging conditions : 1 hour and 30 min lecture, presented at the Faculty of Mechanical Engineering, University of West Bohemia, on Tuesday, June 14th, 2022. [COBISS.SI-ID 113225475]
  • Wrzensinska, Dagmar. Road Safety Future. Published in the first issue of ‘Cities in motion. The 15-year city.’ at the 2022 Annual Polis conference.
  • Final brochure (EN–NL)