Team members from i-DREAMS and MEDIATOR have met up recently to discuss a possible collaboration. Both Horizon 2020 projects got kicked off in May 2019. Given the link between the projects and their complementarity, both teams are currently looking for opportunities to organise joint workshops and seminars.
MEdiating between Driver and Intelligent Automated Transport systems on Our Roads
MEDIATOR will develop a mediating system for drivers in semi-automated and highly automated vehicles, resulting in safe, real-time switching between the human driver and automated system based on who is fittest to drive.
In the picture, from left to right: Prof. George Yannis (NTUA – IDREAMS), Michiel Christoph (SWOV – MEDIATOR), Dr. ir. Nicole van Nes (SWOV – MEDIATOR), Prof. Tom Brijs (IMOB – IDREAMS), Prof. Pete Thomas (LOUGH – IDREAMS) and Dr. Eleonora Papadimitriou (TUDELFT – IDREAMS)
Not in the picture: Prof. Geert Wets (IMOB-IDREAMS)